Solar Energy for Manufacturing Plants and Factories in Colombia: How to Size It Against the Load Profile

A factory brings together what commercial solar needs: consumption from Monday to Saturday, large roofs and an energy bill that weighs on production costs. But “factory” is not a consumption profile: a one-shift plant, a three-shift plant and a continuous process, with the same solar plant per kW of load, cover very different shares of their consumption. This guide does not repeat how to read a company's bill or how much roof a kWp takes, which are already covered on the site; it adds what is specific to a manufacturing plant: its load profile by shifts and processes, how much of the consumption solar can cover, the power factor, switchboard voltage, continuity of supply and the installation window. Hourly production comes from PVGIS (queried on 13 November 2026) and the shift model is our own calculation with declared assumptions, not a real project.

21 min read Published on Reviewed on

In short

In a factory, the share of electricity consumption that solar covers depends above all on the shifts. With 1.25 kWp for each kW of shift load (a size that barely exports during shift hours) and off-shift consumption of 25%, our own model with PVGIS hourly data for Bogotá, Medellín, Cali and Barranquilla gives: 34% to 41% of consumption for a one-shift plant (6:00 to 14:00, Monday to Saturday), 25% to 30% with two shifts, 19% to 23% with three and 18% to 22% for a continuous process. Solar only replaces electricity: heat for furnaces and boilers that run on gas, coal or other fuels is left out. Before getting a quote you need to check the power factor, switchboard voltage and continuity, because a grid-connected solar plant disconnects when the grid goes down.

Key points

  • The load profile rules: with 1.25 kWp per kW of shift load, solar covers between 18% and 41% of consumption depending on the shifts (our own model with PVGIS data).
  • Solar only replaces electricity. According to UPME, electricity is 15% of the energy sources used by Colombian industry, and direct and indirect heat add up to 87% of its end uses.
  • A 6:00 to 14:00 shift coincides with 77% to 79% of the day's solar production; the afternoon and the days without production are what generate surplus.
  • The more continuous the process, the less the solar plant exports: in a 24-hour operation load usually stops being the limit, and roof area, budget or the 1 MW threshold take over.
  • Solar lowers the active energy drawn from the grid but not the reactive energy: the metered power factor worsens during sunny hours and has to be calculated beforehand.
  • The switchboard voltage decides whether a transformer is needed: RETIE standardises 120/208 V for general-use low-voltage networks, but a plant with its own transformer may distribute at another voltage, and there are large inverters for 220 V and others that only run at 380, 400 or 480 V. If the inverter does not match the switchboard, a coupling transformer is needed.
  • A grid-connected solar plant is not backup: RETIE requires the inverter to stop energising the grid within 2.0 s of losing grid voltage.

Why the factory is the classic commercial case, and which part of its energy solar touches

A manufacturing plant usually meets the three conditions that make a commercial solar project strong: it consumes while the sun is up, it consumes almost every day and it has large, unobstructed roofs. Why that shortens the payback compared with a home is covered in the article on why a business recovers the solar investment sooner; here the question is how it plays out in a specific factory.

The first clarification is about scope. A photovoltaic plant produces electricity and only replaces electricity, which in Colombian industry is the smaller part of the energy used. According to UPME's National Energy Plan 2024-2054, with data from the Colombian Energy Balance, the energy sources most used by industry are natural gas (29%), mineral coal (24%), bagasse (19%) and electricity (15%). The same document, citing the first Useful Energy Balance (2018 data), splits industry's end uses as follows: indirect heat, such as steam, 44%; direct heat, such as furnaces, 43%; motive power, including refrigeration, 11%; and other uses such as lighting and IT, 2%.

That has two consequences for the project. Gas- or coal-fired furnaces and boilers do not consume less because of panels: the solar plant acts on the electricity bill, not the gas bill. And any percentage a proposal promises must be expressed over electrical kWh, never over the factory's total energy.

A plant's load profile: shifts, non-production days and processes

In a factory, monthly consumption says little. What decides how much of a solar plant's output is used is the shape of the hourly curve: when each shift starts and ends, how much stays on outside shifts and what happens on Saturdays, Sundays, public holidays and scheduled shutdowns.

Each process leaves a different mark on that curve. Production motors (conveyors, mills, extruders, pumps, fans) follow the shift; in a grid-connected plant their starts and peaks are supplied by the grid, and the solar plant does not need to cover them. Compressed air often stays partly on outside shifts, because of leaks and equipment that remains pressurised, and it is one of the base loads most worth measuring. Furnaces and process heat count for solar only if they are electric (induction or resistance), in which case they are often among the plant's largest loads. Process cooling, cold rooms and chillers run day and night: solar feeds them during the day and at night they stay on the grid.

The practical way to see this is to ask the retailer or the network operator for twelve months of hourly load data and, if possible, to measure the large processes circuit by circuit for a few weeks. That separates three quantities the sizing needs: the shift load, the off-shift base load and the non-production days. If the company is planning a new shift, a new line or the electrification of a thermal process, the profile changes: the solar plant is sized for the load of the coming years, not only for that of the last twelve months.

How much of the consumption solar can cover: a shift model

To give orders of magnitude, we modelled a standard plant with four schedules and PVGIS hourly production for Bogotá, Medellín, Cali and Barranquilla, using 19 years of data (2005-2023). It is our own calculation, not a measurement of real plants; the assumptions are listed in the next section.

The solar plant was sized at 1.25 kWp for each kW of shift load, the load-cap criterion from the article on roof area: since a solar plant rarely delivers more than 80% of its kWp in an hour (in PVGIS hourly data the maximum ranges from 0.81 to 0.87 kW per kWp depending on the city), at that size it barely exports during shift hours. Each range goes from the city with the least sun (Cali) to the one with the most (Barranquilla).

Three readings. The percentage falls as shifts are added not because the solar plant produces less, but because consumption grows in hours without sun: in kWh, the three-shift plant uses more solar energy than the one-shift plant. A 6:00 to 14:00 shift coincides with 77% to 79% of the day's solar production; the afternoon, when that schedule only serves the base load, and Sunday are what generate surplus. And in the continuous process a solar plant of this size does not export: in the model it could reach 1.5 kWp per kW of load while exporting at most 1% of what it produces, so load stops being the limit and roof area, budget or the 1 MW threshold take over.

Off-shift consumption matters for the one-shift plant. If it is 15% of the shift load instead of 25%, solar covers somewhat more of the consumption (38% to 45%) but exports between 18% and 21% of what it produces; if it is 40%, it covers 30% to 36% and exports 5% to 8%.

  • One shift, Monday to Saturday from 6:00 to 14:00: solar covers 34% to 41% of annual consumption and exports 12% to 15% of what it produces.
  • Two shifts, Monday to Saturday from 6:00 to 22:00: it covers 25% to 30% and exports 7% to 8%.
  • Three shifts, from Monday at 6:00 to Sunday at 6:00: it covers 19% to 23% and exports 7% to 8%, almost all of it on Sunday.
  • Continuous process, with constant load all year: it covers 18% to 22% and does not export.

A worked example with declared assumptions

The example is modelled, not a real project. A fictitious two-shift plant in Bogotá, with 400 kW of shift load and 100 kW off-shift, consumes about 2,379 MWh a year (about 198 MWh a month). With 500 kWp, PVGIS gives production of about 661 MWh a year: about 616 MWh are self-consumed, 25.9% of consumption, and about 45 MWh are exported, 6.7% of production, practically all of it on Sundays.

Three practical consequences. With 400 kW of demand and 198 MWh a month, the company meets the threshold to be treated as an unregulated user (0.1 MW or 55 MWh a month, measured at a single individual delivery point, under Resolución CREG 131 de 1998); if it contracts as an unregulated user, the value of each avoided kWh comes from its contract and not from the regulated unit cost, as the article on the company bill explains. The 45 MWh on Sundays are surplus from a plant of more than 100 kW, with the charges per swapped kWh explained in the article on surplus sales. And 500 kWp on a flat roof need, using the criteria in the article on roof area, roughly 2,500 to 2,600 m² of array field at 10° (about 3,200 using NREL's 70%), before subtracting edges, walkways and equipment.

  • Production: PVGIS 5.3, ERA5 hourly series from 2005 to 2023, modules at 10° facing south, 14% system losses and no nearby shading, averaged over the 19 years. Annual yield: 1,322 kWh per kWp in Bogotá, 1,445 in Medellín, 1,268 in Cali and 1,572 in Barranquilla.
  • Colombian local time (UTC-5).
  • Constant shift load; off-shift, 25% of the shift load (cooling, compressed air, lighting, IT systems).
  • One shift: Monday to Saturday from 6:00 to 14:00. Two shifts: Monday to Saturday from 6:00 to 22:00. Three shifts: from Monday at 6:00 to Sunday at 6:00. Continuous process: constant load 24 hours a day, every day.
  • Size: 1.25 kWp for each kW of shift load.
  • No public holidays, collective vacations or shutdowns: every day the plant stops looks like a Sunday and adds surplus.
  • Coverage: energy self-consumed hour by hour divided by annual consumption. Exports: production above each hour's load, divided by annual production.
  • Example: Bogotá, two shifts, 400 kW of shift load, 100 kW off-shift and 500 kWp.

How to size against a plant's profile

Capacity is chosen with the three caps from the article on roof area —the energy to be covered, the usable daytime load and the available area— and the lowest one wins. In a factory, the load cap is calculated with the load that holds during the central sunny hours of production days, neither the peak nor the daily average; the afternoon, if the shift ends before sunset, and the non-production days tell how much is exported, as the model shows.

Those days govern the surplus. A Sunday is one seventh of the year's solar production (14.2% to 14.3% in the PVGIS data); if the plant also stops on Saturday, it is two sevenths, plus public holidays and shutdowns. If the base load on those days is low, a good part of that production goes to the grid: in the model, about half of what is produced on Sunday with a 25% base load (47% to 55% depending on the city) and about two thirds with 15%.

There are three ways to handle it, and the proposal must say which one it uses: accept it as surplus, at the value given by the project's regulatory category (energy credit for a small-scale self-generator, a contract with a representative for a large-scale one); curtail it with zero export, with a simpler connection procedure in exchange for losing that energy; or move shiftable loads, such as charging forklift batteries or pumping to tanks, into the sunny hours of those days. Which is best is a calculation, not a rule, and the article on surplus sales explains it.

The value of each avoided kWh comes from the plant's own bill, not from a published tariff: the voltage level changes the unit cost, and an industrial user has not paid the 20% solidarity contribution since 2012 if its main activity is listed in Decreto 2860 de 2013 and it has applied to its retailer for the exemption. Decreto 2860 is still in force, but the exemption is under discussion: the Finance Ministry's draft decrees (August 2025 and July 2026) would keep it for manufacturing (CIIU codes 101 to 332) and remove it from other activities that have it today, and as of 1 October 2026 a bill to abolish it for all industrial users was on record in the Senate. That is why the project should be assessed with and without it, as the article on the company bill explains.

Power factor and reactive energy: the effect that shows up later

Motors, compressors and cooling equipment consume reactive energy as well as active energy. Resolución CREG 101 035 de 2024 requires the inductive power factor of a user's installation to be 0.90 or higher, determined hourly (per billing period if the meter does not record hourly); whoever exceeds the limits pays for transporting the excess reactive energy under Chapter 12 of Resolución CREG 015 de 2018. How it appears on the bill is covered in the article on the company bill.

A solar plant operating at unity power factor reduces the active energy the factory draws from the grid, but not the reactive energy. Our own calculation shows it: a plant with 400 kW of load and a power factor of 0.92 draws about 170 kvar; if mid-morning the solar plant delivers 200 kW, the grid now supplies 200 kW with the same 170 kvar, and the power factor metered in that hour falls to 0.76. Because the rule is hourly, the problem appears precisely in the sunniest hours. And in the hours when the plant exports, such as Sundays, the grid delivers no active energy: all the inductive reactive energy recorded in that hour is then charged (literal b of Chapter 12 of Resolución CREG 015 de 2018).

There are three answers, and they are defined in the design. Compensation with a capacitor bank, whose controller should be reviewed because solar changes what it measures, without overshooting: capacitive reactive energy has its own limit (a capacitive power factor of 0.90 at levels 1 and 2, 0.95 at level 3 and 0.98 at level 4, per billing period, under Resolución CREG 101 035 de 2024). The inverter itself: commercial inverters allow the power factor to be adjusted (Huawei's SUN2000-150K-MG0, for example, between 0.8 leading and 0.8 lagging), but RETIE requires the inverter to keep a power factor above 0.9 when it delivers more than 50% of its rated power (literal f of section 2.3.23.1 of Book 2 of Resolución 40284 de 2026), which limits how much reactive power it can supply in the hours of highest output. And the regulatory one: Decreto 929 de 2023 exempts users with small-scale self-generation from non-conventional renewable energy sources (FNCER), such as solar, from reactive-energy charges. If the retailer applies it, neither the export-hour charge nor the capacitive one should reach that self-generator; before counting on it, ask the retailer how it applies it, and remember that it does not reach a plant of more than 1 MW, which falls outside that exemption.

Voltage level, switchboards and connection point

A plant that receives power at medium voltage, usually at level 2 (1 kV to less than 30 kV, under Resolución CREG 015 de 2018), and has its own transformer distributes at low voltage inside the factory. The level changes the price of the avoided kWh, as explained in the article on the bill; in the design it also raises two questions.

The first is which switchboard each inverter connects to, and at what voltage. RETIE sets 120 V phase-to-ground and 208 V phase-to-phase as the standard voltages for general-use three-phase low-voltage networks, and warns that using equipment at other voltages requires special transformers (Title 9 of Book 3). But that is the general-use network: a plant with its own transformer may distribute at another voltage, such as 440 or 480 V, and what counts is the voltage of the switchboard each inverter connects to. Inverters are also built for different voltages: Huawei's 150 kW SUN2000-150K-MG0 runs at 380, 400 or 480 V, and its 80 kW SUN2000-80K-MGL0 at 220 V. If the switchboard voltage does not match the inverter's, a coupling transformer is needed, with its cost, losses and footprint, and the proposal should say so from the start.

The second is capacity. For the 1 MW limit of small-scale self-generation, what counts is the sum of the inverters' rated AC capacities (Article 3 of Resolución CREG 174 de 2021, which refers to Resolución UPME 281 de 2015). If the plant exports surplus and connects at voltage level 1, before applying for connection you must check on the network operator's website that the circuit has availability (Article 6 of the same resolution); self-generators that do not export are not subject to those limits. And the plant's own transformer should be reviewed, because exported energy flows through it in reverse. Which regulatory category fits a large plant is covered in the article on self-generation and distributed generation.

Continuity: what a grid-connected solar plant does not do

It is the question asked most often in a plant, and it deserves a straight answer: a grid-connected solar plant does not keep the factory running during an outage. RETIE requires the grid-connected inverter to have islanding protection, so that the generator stops energising the local network operator's grid within no more than 2.0 s of losing grid voltage (item 1 of literal j of Article 3.17.21 of Book 3). It is a protection for people working on the grid, and that is why a conventional grid-tied inverter disconnects when the grid goes down and comes back when it is restored.

The question has context in 2026. In response to the 2026-2027 El Niño event, CREG adopted transitional measures to secure supply (Resolución CREG 101 127 de 2026) and, with Circular CREG 343 de 2026, started the supply-shortage risk period on 5 September; the circular itself states that this does not, by itself, mean scheduled rationing. A solar plant reduces what the factory draws from the grid during sunny hours, but it does not protect it from an outage.

For solar to sustain loads during an outage, a different architecture is needed: inverters able to operate islanded from the grid, storage, and a means of separating the installation from the grid before feeding the loads. It means more investment and more paperwork: when storage is included, Resolución CREG 101 113 de 2026 adds technical requirements and tests to the connection procedure of Resolución CREG 174 de 2021. The sensible starting point is to identify which loads are critical and for how long they must be sustained; when batteries are justified is covered in the guide on panels with batteries.

If the plant already has an emergency generator, the design must define how the two coexist: what the solar system does when the generator starts and how it is coordinated with the transfer system. It is a question for the electrical designer, and the answer should be written into the proposal.

The installation window: installing without stopping production

Roof mounting and cable runs can progress while the plant is producing, but two moments affect operations: work on roofs above process areas and the final connection to the switchboards, which requires de-energising them. It is best to schedule that connection during a shutdown that is already planned —a Sunday, a public holiday, a maintenance stop— and to ask the installer for a written outage plan.

Roof work is work at height, regulated by Resolución 4272 de 2021, and the contracting company also has verification duties; the article on choosing a provider details what to ask for. RETIE also requires the design to define the means of access and movement for installing, inspecting, operating and maintaining the panels, and the inspection body must be able to verify them in the finished installation (literal o of Article 3.17.23 of Book 3).

The timeline also depends on procedures with their own deadlines: the connection with the network operator and, if the company is going to use the tax incentives, the certification with UPME, which is best requested early so as not to advance the VAT on the equipment, as the article on tax benefits explains.

What to bring to the commercial quote

With this data, a proposal for a manufacturing plant comes from calculations rather than assumptions, and it should return consumption coverage and surplus by month and by type of day, how the power factor is handled, the voltage and connection point of each inverter, and what happens during an outage.

If you want your plant assessed with these criteria, you can request a commercial quote through Nodosolar. Whoever prepares it, it is worth arriving with the following:

  • Twelve months of hourly load data and the production calendar: shifts, Saturdays, public holidays, collective vacations and shutdowns.
  • The large loads and their schedules (electric furnaces, compressors, cooling, motors) and any planned changes to shifts or equipment.
  • Twelve bills, the voltage level, whether the company is a regulated or unregulated user and whether the contribution exemption is applied.
  • The reactive-energy record or the hourly power factor, and the condition of the capacitor bank if there is one.
  • The voltage and capacity of the switchboards where the plant would connect, and the capacity of the plant's own transformer.
  • Drawings or photos of the roofs, with the equipment and process areas underneath.
  • Which loads must keep running during an outage and whether there is an emergency generator.

Found this useful? Add us as a preferred source in Google.

Sources: PVGIS 5.3, hourly series (seriescalc, ERA5 data 2005-2023): hour-by-hour yield per kWp at 10° facing south, queried on 13 November 2026 (opens in a new tab) · Plan Energético Nacional 2024-2054, Volume I (National Energy Plan: industrial energy sources and end uses) (opens in a new tab) · Resolución CREG 131 de 1998 (unregulated user threshold) (opens in a new tab) · Resolución CREG 101 035 de 2024 (power-factor limits) (opens in a new tab) · Resolución CREG 015 de 2018 (distribution methodology and voltage levels) (opens in a new tab) · Decreto 929 de 2023 (energy policy; reactive-energy exemption for small-scale self-generators) (opens in a new tab) · SUN2000-150K-MG0 inverter technical specifications (nominal output voltage 380/400/480 V; adjustable power factor 0.8 leading to 0.8 lagging; anti-islanding protection) (opens in a new tab) · SUN2000-80K-MGL0 inverter datasheet (80 kW; nominal output voltage 220 V) (opens in a new tab) · RETIE — Resolución 40284 de 2026, amending the regulation adopted by Resolución 40117 de 2024 (electrical installations) (opens in a new tab) · Resolución CREG 174 de 2021 (net metering regulation) (opens in a new tab) · Resolución UPME 281 de 2015 (1 MW limit for small-scale self-generation) (opens in a new tab) · Resolución CREG 101 113 de 2026 (battery storage; current text of article 14 of Resolución CREG 174) (opens in a new tab) · Resolución CREG 101 127 de 2026 (transitional measures for the 2026-2027 El Niño event) (opens in a new tab) · Circular CREG 343 de 2026 (start of the supply-shortage risk period) (opens in a new tab) · Ley 1430 de 2010 (tax-normalisation law; electricity levy for industrial users) (opens in a new tab) · Decreto 2860 de 2013 (industrial users exempt from the electricity levy) (opens in a new tab) · Draft decree on the electricity levy exemption (July 2026) (opens in a new tab) · Senate news item on the bill to remove the industrial exemption (1 October 2026) (opens in a new tab) · Resolución 4272 de 2021 (safe work at height) (opens in a new tab)

Frequently asked questions

What percentage of a factory's consumption can solar cover?

It depends above all on the shifts. In our own model with PVGIS hourly data, with 1.25 kWp per kW of shift load and off-shift consumption of 25%, solar covers 34% to 41% of electricity consumption with one shift, 25% to 30% with two, 19% to 23% with three and 18% to 22% in a continuous process. These are orders of magnitude: your plant's figure comes from its load curve and its roof.

Can solar power the plant's furnaces and boilers?

Only if they are electric. A photovoltaic plant replaces electricity, and in Colombian industry most of the energy comes from fuels: according to UPME, natural gas is 29%, mineral coal 24% and bagasse 19% of the energy sources used by industry, compared with 15% for electricity. Electric furnaces do count, and they are often among the largest loads.

Will my factory keep running on solar if the power goes out?

Not with a conventional grid-connected solar plant. RETIE requires the inverter to stop energising the grid within 2.0 s of losing grid voltage, and the inverter stays disconnected until the grid returns. Sustaining loads during an outage requires inverters that can operate islanded, storage and a means of separating from the grid.

Can the solar plant worsen the power factor?

Yes, the one recorded by the meter at the commercial boundary. Solar reduces the active energy drawn from the grid but not the reactive energy of motors and compressors, and Resolución CREG 101 035 de 2024 measures the inductive power factor hourly, with a minimum of 0.90. It is solved with compensation or by adjusting the inverter within RETIE limits. Decreto 929 de 2023 exempts small-scale self-generators using FNCER (up to 1 MW) from reactive-energy charges, but confirm with the retailer how it applies it. It has to be calculated before installing.

Is solar worth it if we work three shifts or 24 hours?

It can be: it covers a smaller percentage of consumption, but almost all the production is self-consumed. In the model, a three-shift plant uses more solar kWh than a one-shift plant with the same load, and in a continuous process load stops being the limit: roof area, budget or the 1 MW threshold take over.

What happens to Sunday solar production?

If the plant is not producing, a large part goes to the grid as surplus: in the model, about half of what is produced that day with a 25% base load and about two thirds with 15%. A Sunday is one seventh of the year's solar production. It can be accepted as surplus, curtailed with zero export or used by shifting loads into those hours; which is best depends on the value the project's regulatory category gives to surplus.

Can it be installed without stopping production?

Largely yes: roof mounting and cabling progress while the plant is working. The final connection to the switchboards requires de-energising them, and it is best done during a planned shutdown, with a written outage plan.