Skip to content
NodoSolar

Solutions

Solar energy for every type of project

Each segment has different consumption, regulations and financing. Choose yours to see what to assess before requesting quotes.

In short

NodoSolar organises solar energy in Colombia into four segments — homes, businesses and retail, industry, and agriculture and rural areas — because three things change between them: when the energy is consumed versus when it is produced, which tariff and incentives apply, and where the system is installed. Those three variables, not the installed capacity, are what determine a project’s return.

Comparison

What changes from one segment to another

The equipment is similar; what decides the outcome is not. This table sums up where the real difference lies.

What changes between segments: the criterion that drives the design in each case.
SegmentWhat drives the designWhere the value sitsUsual models
HomesMonthly consumption and usable roof spaceReducing grid consumption during daylight hoursOutright purchase or a general-purpose loan
Businesses and retailOverlap between opening hours and generationHigh self-consumption plus tax benefitsPurchase, leasing or PPA
IndustryThe plant's hourly load profileStabilising a large, volatile operating costPurchase with accelerated depreciation, or PPA
Agriculture and rural areasService quality and distance to the gridReplacing diesel or solving a lack of gridPurchase, frequently with battery backup

Criteria

Five questions before choosing

Answering them before requesting quotes stops you comparing proposals that are not actually comparable.

  1. When you consume

    It is the variable that moves the return the most. The energy you use while the system is producing saves you the full tariff; what you export is offset according to what the regulation sets, at a value that need not match it.

  2. What tariff you pay

    A commercial or industrial user paying the solidarity contribution saves more per avoided kWh than a subsidised residential user. The same installed capacity performs differently depending on who uses it.

  3. Which tax category applies to you

    The benefits of Laws 1715 of 2014 and 2099 of 2021 only add value for someone who files income tax and certifies the project with UPME. In housing that component simply does not exist.

  4. Where you are going to install

    Clay tile, metal sheeting, a flat roof or the ground all have different structures, costs and maintenance. On large projects the ground competes with the roof; on housing, almost never.

  5. What happens if the power goes out

    A grid-connected system shuts down during an outage for safety. If you need continuity, that is solved separately with batteries or backup, and it is justified by the cost of having no power, not by savings.

Questions about the segments

Frequent doubts when deciding which type of solar project fits your case.

How do I know which segment I fall into?

By the use of the property and the type of tariff you pay, not by the size of the system. A home on a residential tariff falls under “homes” even if it installs 8 kWp; a unit on a commercial tariff falls under “businesses” even if it installs 3 kWp, because the applicable incentives and the consumption profile change.

Is the price per kWp the same across all segments?

No. At greater scale the cost per installed kWp falls, because the fixed project, legalization and mobilisation costs are spread across more capacity. On the other hand, costs appear that do not exist in housing: connection studies, civil works or operation and maintenance contracts.

Why do businesses usually get a better return than households?

For two reasons that compound: a business with daytime opening hours consumes precisely during the generation hours, which maximises self-consumption; and commercial tariffs, with the solidarity contribution, are higher, so every kWh you stop buying is worth more.

Do I need a prior study before requesting quotes?

For housing, twelve months of bills and a photo of the roof are enough. On business and industrial projects, the hourly consumption history and the state of the connection point change the design enough to be worth requesting before committing a budget.

Can I install without paying up front?

In the business and industrial segments yes, through leasing or a power purchase agreement (PPA) in which a third party installs and operates the system. In housing the usual route is a general-purpose loan or the financing the installer itself offers.

Do the four solutions use the same equipment?

The modules are essentially the same. What changes is everything else: type of inverter, structure, protections, monitoring and the associated level of maintenance. An industrial system calls for monitoring with alarms and thermography that would not be justified on a home.

Ready to take the next step?

Tell us about your project and receive comparable quotes from verified installers. Free and with no obligation.